|
| Latitude : | 66.15515 | |
| Longitude : | -65.67072 | |
| Altitude (m) : | ||
| Startup date : | August 20, 2009 |
|
Borehole depth: -16.5 m
Herbaceous vegetation. Presence of muboils. Poorly drained Ice rich colluvium over till Phase 2, Pangnirtung, Nunavut PVC pipe filled with silicone oil Thermistors distribution (m): 0.25;0.50;0.75;1;1.50;2;3;4;5;6;8;10;12;14,9 |